NH Hotel
Site management and site procurement
Construction of the NH Hotel – Venice
The construction of the NH Hotel in Venice is part of hospitality development projects carried out within a historic urban context, aiming to combine functional requirements, architectural quality, and integration with the existing built environment. The project was developed with careful consideration of Venice’s unique architectural and cultural setting, addressing the relationship between the new hotel function and the historic fabric.
Urban framework and historic context
The intervention is located within an area of high historical and cultural value, characterized by architectural and landscape constraints. The design addresses the challenge of integrating a hospitality facility into the consolidated urban fabric of Venice, ensuring formal coherence and contextual compatibility.
Design principles and architectural quality
Design choices are focused on achieving a balance between innovation and respect for the historic context, through architectural solutions that enhance the building without compromising its identity. The project aims to deliver functional and recognizable spaces aligned with the quality standards of the NH hotel brand.
Space organization and hospitality function
The internal layout of the hotel is designed to ensure operational efficiency and guest comfort, with a clear organization of reception areas, guestrooms, and shared services. The adopted solutions support smooth circulation and enhance the overall hospitality experience.
Building performance and long-term management
The project integrates technical solutions focused on reliability, durability, and efficient building systems, consistent with the operational requirements of contemporary hotel facilities. The design approach aims to ensure adequate performance and sustainable long-term management of the building.
PLACE
Venezia (VE)
CLIENT
Itafem s.r.l.
WORK PERIOD
2018
ACTIVITY
Construction Management
Construction site procurement
TYPOLOGY
Construction management
INTENDED USE
Receptive
WORK AMOUNT
€ 8.000.000,00
WORKING GROUP
Ing. Marco Montagna
Ing. Marco Montesi
Itafem s.r.l.