Comune di Gabicce Mare

Design and construction management of the new municipal headquarters

Gabicce Mare Town Hall

The new Gabicce Mare Town Hall, located in Gabicce Mare, is a new construction project developed after the former municipal building was declared unfit for use following the 2016 seismic events. The project redefines the role of the public building within the urban context, strengthening its relationship with the Municipal Square.

Public building and urban space

The intervention includes the construction of the new town hall and the redevelopment of surrounding public spaces, featuring new paving, urban furniture, and lighting solutions aimed at improving usability and spatial quality.

Timber structure and seismic performance

The adoption of an entirely timber structural system ensures high seismic performance, while providing thermal and acoustic comfort and effective control of thermal bridges. The chosen construction system meets requirements for structural reliability and long-term durability.

Energy efficiency and sustainability

The new building is designed as an nZEB (Nearly Zero Energy Building), integrating solutions focused on reducing energy consumption and incorporating renewable energy sources. The goal is to minimize environmental impact and optimize life-cycle operating costs.

Functional layout of the building

The town hall is arranged over three above-ground floors and one basement level, with an irregular volumetric configuration that optimizes the layout of administrative spaces. The council chamber, located on the ground floor, is designed as a flexible space suitable for institutional and public events.

Roof and access systems

The roof hosts a panoramic terrace equipped with photovoltaic panels. Vertical circulation is provided by a central staircase and an elevator, ensuring full accessibility and a functional relationship between the municipal administration and citizens.

PLACE

Gabicce Mare (PU)

CLIENT

Comune Gabicce Mare

WORK PERIOD

2017 / 2018

ACTIVITY

Safety coordination
Structural Design
Structural Works Management

TYPOLOGY

New Construction

INTENDED USE

Institutional

WORK AMOUNT

€ 1.400.000,00

WORKING GROUP

Arch. Michele Bonini
Cat Impianti Srl
Studio Paci Srl
Subissati Srl