Centocelle Archaeological Park
Recovery of the former service station
Urban Regeneration in Centocelle – Rome
The urban regeneration project in the Centocelle district of Rome is part of a broader process aimed at the redevelopment of the existing urban fabric, with the goal of improving the quality of the built environment and strengthening the relationship between architecture, functions, and the local community. The intervention addresses urban transformation through an integrated and sustainability-oriented approach.
Urban context and territorial framework
The project area is located within a consolidated urban context, characterized by a strong neighborhood identity and high building density. The intervention addresses typical challenges of mature urban fabrics, focusing on spatial continuity, public space quality, and the relationship between buildings and the surrounding urban system.
Objectives of urban regeneration
The intervention aims at the functional reactivation of spaces and the improvement of livability conditions through design solutions capable of responding to the contemporary needs of the district. Urban regeneration is conceived as a tool to enhance existing assets, reduce land consumption, and promote sustainable transformation.
Design strategies and integrated approach
The adopted strategies are based on a multidisciplinary approach, integrating architectural, functional, and urban aspects. The project seeks to improve spatial organization, the usability of shared areas, and the integration of new functions into the existing context, while maintaining a balance between transformation and place identity.
Regeneration as a tool for urban enhancement
The urban regeneration project in Centocelle represents an intervention focused on urban quality and social cohesion, contributing to neighborhood revitalization and strengthening local identity. The project plays a strategic role in the city’s renewal process, promoting a sustainable and inclusive vision of urban development.
PLACE
Roma
CLIENT
Comune di Roma
WORK PERIOD
2024 / ONGOING
ACTIVITY
Executive design
Final design
Preliminary design
Works Supervision
TYPOLOGY
Urban Regeneration
INTENDED USE
Multifunctional
WORK AMOUNT
€ 3.228.000,00
WORKING GROUP
Englobe