Nursery school

Construction of a new nursery school

An Integrated School Campus in Corinaldo

The new Nursery School of Corinaldo (AN) was designed to provide an innovative and sustainable educational environment, aimed at supporting children’s learning and overall well-being. Located immediately downhill from the S. M. Goretti primary school, the building is part of an integrated school campus, enhancing educational continuity and reinforcing the social role of the area.

Timber Architecture and Sustainable Building Design

The project is based on the principles of green building and sustainable architecture, combining the use of natural materials with advanced energy-efficient technologies. The choice of timber construction ensures a reduced environmental impact, excellent thermal and acoustic insulation, and long-term durability. This environmentally conscious approach positions the school as a model of low-energy, eco-friendly architecture.

Flexible and Functional Educational Spaces

Interior spaces are designed to be flexible and adaptable, responding to the evolving needs of contemporary education. The heart of the building is a central multipurpose hall, which acts as the core of school life and around which classrooms, administrative offices, and service areas are organized. The layout maximizes solar orientation, improving energy efficiency and visual comfort throughout the learning environments.

A Forward-Looking Model for School Architecture

The new Nursery School of Corinaldo represents an example of excellence in educational architecture, successfully combining aesthetic quality, functionality, and sustainability. The building responds to today’s educational requirements while providing a safe, inclusive, and stimulating environment for future generations.

PLACE

Corinaldo (AN)

CLIENT

Unione dei comuni Misano-Nevola

WORK PERIOD

2019 / 2022

ACTIVITY

Design phase Safety coordination
Executive design
Final design
General coordination and integration of specialist disciplines

TYPOLOGY

New Construction

INTENDED USE

Education

WORK AMOUNT

€ 1.350.000,00

WORKING GROUP

Arch. Silvia Lupini
Englobe
Ing. Alberto Romagnoli
Vitre Studio S.r.l.