San Bortolo Hospital

Construction of the new health centre

Renovation of San Bortolo Hospital

The renovation project at San Bortolo Hospital focuses on the upgrading and redevelopment of one of the main healthcare facilities in the area, with the aim of improving the functionality of hospital spaces, safety standards, and the overall quality of care environments.

The project is developed within a highly complex context, where continuous hospital operation must be ensured throughout all phases of construction.

Healthcare framework and operational context

San Bortolo Hospital is a strategic healthcare facility at the territorial level. The renovation project addresses a fully operational building, requiring design solutions compatible with ward organization, patient and staff circulation, and the advanced building systems typical of hospital facilities.

Objectives of hospital renovation

The intervention aims to enhance the functional and performance standards of healthcare spaces, adapting them to current regulations and contemporary hospital design requirements. Particular attention is given to safety, efficient circulation, and the quality of care environments.

Design criteria and space organization

Design choices are based on principles of functional rationalization, flexibility, and operational compatibility, minimizing interference with ongoing healthcare activities. Spatial organization is designed to optimize internal flows and improve overall building efficiency.

Renovation as a tool for healthcare infrastructure enhancement

The renovation of San Bortolo Hospital represents a strategic action for upgrading existing healthcare infrastructure, improving working conditions for medical staff and the quality of patient care. The intervention highlights renovation as a key tool in the modernization and strengthening of hospital facilities.

PLACE

Vicenza (VI)

CLIENT

Eris s.r.l.

WORK PERIOD

2022 / 2024

ACTIVITY

Construction site procurement

TYPOLOGY

Restoration

INTENDED USE

Sanitary

WORK AMOUNT

€ 18.000.000,00

WORKING GROUP

Arch. Tatiana Levitskaya
Dott.sa Claudia Marinoni
Ing. Francesca Montagna
Ing. Marco Montagna
Ing. Marco Montesi